Category: Pipe

Difference Between Schedule 40 and Schedule 80 Pipe

Attributes such as outside diameter, wall thickness, and inside diameter all need to be understood when working with metal pipes.

Pipe Schedule Chart

When working with pipe, it is common to describe them by their “schedule”.

Video Blog: What Do Pipe Schedules Mean?

Measuring pipe can be a bit confusing, so Operations and Development Manager Jason Jackson looks at Pipe Schedules and how they are used to measure pipe.